Build the preliminary takeoff
Enter each zone in the direction the turf will run. Leave unused zones at zero.
How the takeoff is calculated
Each zone is calculated separately before totals are combined.
Roll cuts are rounded up from zone width divided by roll width. Order area uses complete roll widths and the entered trim allowance. Base volume includes the selected ordering allowance.
Information to confirm before ordering
- Actual product roll width, available roll length and grain direction.
- Approved base depth, aggregate type and compaction requirements.
- Infill type and application rate for the selected turf system.
- Edge detail, fastening method, seam system and substrate compatibility.
- Delivery access, unloading, storage and installation sequencing.
Last updated August 28, 2026. Confirm every quantity against drawings, field measurements and current supplier information.